Kuala Lumpur skyline at night with Petronas Twin Towers over an illuminated geospatial utility network grid

NIK Utility Mapping

NUMS TradingUnderground Utility Mapping & Land Survey Specialists

World-class geospatial and underground utility mapping services for Malaysia's infrastructure development.

100% Bumiputera-owned
Registered with SSM
Est. 2023
01

About Us

Professional & Experienced Workforce.

100% Bumiputera-owned

Registered with the Companies Commission of Malaysia (SSM) under registration number TR0334931-X (202503354201).

Established 2023

Operating nationwide in underground utility mapping and topographic survey services across Malaysia.

Accuracy First

Focused on accurate, efficient and high-quality land survey work aligned with construction industry demands.

Partner to Utility Owners

Working closely with contractors and utility providers so every project meets strict safety and technical standards.

National Contribution

Committed to supporting national economic growth through professional geospatial and mapping services.

Vision & Mission

“To become a world-class service provider and a benchmark of excellence in underground utility mapping — supporting the nation's infrastructure development through creative, innovative, and high-tech human capital.”

2023

Established

100%

Bumiputera-owned

02

Our Objectives

Meet client needs and requirements with efficient and accurate service.

Deliver high-quality, efficient and intelligent survey consultancy aligned with each project's requirements.

Produce products, data and information according to client specifications, professionally.

Ensure survey planning and execution is carried out by trained and skilled officers.

Develop personnel at all levels to be highly capable in technical skill, professionalism and work ethics.

Prioritise research and development, and keep pace with the latest technology.

05

Our Services

Professional & Experienced Workforce. End-to-end geospatial capability, from first scan to endorsed as-built drawings.

Underground Utility Mapping

Detecting and mapping underground utilities — cables and pipes — before any excavation begins.

Topographic Survey

Detailed topographic mapping of terrain, levels and site features.

Boundary Stone Search

Locating and verifying land boundary markers on site.

Land Survey

Accurate land measurement and cadastral survey work.

Drone LiDAR

Aerial LiDAR scanning for high-precision terrain and asset data.

Traffic Management Plan (TMP)

Traffic management planning for roadworks and excavation zones.

06

Our Work Flow

As a Utility Infrastructure Plan Provider, every project follows a disciplined, auditable sequence.

  1. 01

    Receive work order from the corridor authority and client.

  2. 02

    Site visit.

  3. 03

    Underground scanning works carried out.

  4. 04

    Preparation of the utility infrastructure plan.

  5. 05

    Submit plan for review by the corridor authority and client.

  6. 06

    Plan preparation & drafting.

  7. 07

    Plan endorsement.

  8. 08

    Joint site visit with the Local Authority (PBT).

  9. 09

    Submission together with the corridor authority and client.

  10. 10

    On-site as-built survey.

  11. 11

    Excavation works carried out.

07

Our Clients

Trusted by Malaysia's leading utility, telecommunications and government agencies.

Tenaga Nasional Berhad (TNB)
NUR Power Sdn. Bhd.
Jabatan Kerja Raya (JKR)
PAAB
Indah Water Konsortium
PETRONAS
Caltex
Shell
Maxis
CelcomDigi
U Mobile
Digi
EDOTCO
Allo
TIME dotCom
Telekom Malaysia (TM)
08

Project File 2026

Completed and ongoing underground utility mapping and survey projects across northern Malaysia.

28

Total projects

52,793+

Metres mapped (listed)

16

Utility & agency clients

No.Project descriptionDistance (m)
01

MSVT utility mapping & land survey — 11kV 240mmp XLPE cable stringing, Kg. Kejai to Kem Kejai, Baling, Kedah

TNB
2,800
02

Proposed 2CCT 11kV route from Pintu Kuala Ketil to SSU UNIMX

TNB
10,000
03

Water reticulation pipe installation (open cut & pipe jacking), Amanjaya, Sungai Petani — Syarikat Air Darul Aman (SADA)

Water (SADA)
5,000
04

Large-scale solar PV plant (LSS) 99.00 MW, Baling, Kedah

Solar (LSS)
2,300
05

Establishment of PPU Cenang Resort 2×30 MVA 33/11kV, Langkawi

TNB
5,400
06

Chuping Valley Industrial Area (CVIA) Phase 1 infrastructure, Perlis — NCIA

Industrial
13,148
07

33kV cable installation via Horizontal Directional Drilling (HDD), Kuala Muda — Maya Jaya solar farm

Solar (LSS)
2,545
08

Kulim Hi-Tech Park Zone Industry Phase 5 infrastructure

Industrial
11,600

Showing a selection of 28 completed and ongoing projects. Additional records are available on request.

10

Our Equipment

Calibrated detection, positioning and safety equipment maintained for field-ready accuracy.

RD8200 Cable & Pipe Locator equipment used by NIK Utility Mapping

RD8200 Cable & Pipe Locator

Ground Penetrating Radar (Leica) equipment used by NIK Utility Mapping

Ground Penetrating Radar (Leica)

GPS RTK — CHCNAV i83 equipment used by NIK Utility Mapping

GPS RTK — CHCNAV i83

Drone LiDAR equipment used by NIK Utility Mapping

Drone LiDAR

Flexi Trace equipment used by NIK Utility Mapping

Flexi Trace

Ultrasonic Cable Height Meter equipment used by NIK Utility Mapping

Ultrasonic Cable Height Meter

Traffic Management Plan (TMP) Gear equipment used by NIK Utility Mapping

Traffic Management Plan (TMP) Gear

Traffic Cones equipment used by NIK Utility Mapping

Traffic Cones

Manhole Key (Round Cover) equipment used by NIK Utility Mapping

Manhole Key (Round Cover)

Manhole Key (50cm Foot Type) equipment used by NIK Utility Mapping

Manhole Key (50cm Foot Type)

What you receive

Deliverables

Utility infrastructure plans in AutoCAD format with GIS data storage for permit applications and future reference.

Cross-sections every 50–100 m as required by the Local Authority (PBT).

Plans approved and endorsed by a licensed land surveyor.

Hard-copy infrastructure plans for the PBT and utility managers to issue excavation permits.

As-built drawings and photographic reports upon completion.

Survey Tower Networking

An additional service for telecommunications operators planning new tower sites.

Signal Strength Assessment

On-site network measurement for YES, CelcomDigi, Maxis, TM Unifi and U Mobile.

Access Road Evaluation

Assessment of site accessibility for construction and maintenance vehicles.

Power Grid Study

Identification of the nearest power source and distance to the proposed tower site.

Population Coverage

Estimation of population coverage within the proposed service radius.

BWA Proposals

Base station and CPE proposals to support telco tower siting decisions.

03

Our Team

Professional & Experienced Workforce. A tiered organisation built around licensed, trained specialists.

NIK Utility Mapping full team group photo in corporate uniform
The NIK Utility Mapping team
NM

Nik Mohd Zafaris Aizat Bin Nik Azman

Director — Land Surveyor

Finance & Administration

  • RM

    Roslina Binti Mohamad Nawar

    Project Manager

  • HF

    Hawa Fatihah Binti Abdul Razak

    Account Manager

  • NA

    Nor Ain Shafiqka Binti Mohd Kasim

    Admin & Finance Executive

  • SA

    Sharifah Alia Sofia Binti Syed Abdul Rahman

    Admin Assistant

Operations

  • MZ

    Ir. Mohd Zulkarnain Bin Mohd Sidik

    Project Manager

  • AZ

    Wan Aiman Zulhakim Bin Wan Mohd Zoro

    Chief Surveyor

Survey & Underground Utility Mapping

  • SI

    Tengku Shahrol Iquan Bin Tengku Mazli

    Surveyor & Underground Utility Mapping

  • AS

    Wan Ahmad Shauqi Bin Wan Md Alimi

    Surveyor & Underground Utility Mapping

  • A

    Aqil

    Assistant Surveyor

  • A

    Adam

    Assistant Surveyor

  • S

    Shamizie

    Assistant Surveyor

  • D

    Danial

    Assistant Surveyor

Engineering & Drafting

  • MA

    Mohd Affendi

    Engineer

  • NS

    Nur Sabrina Irwayu Binti Abdul Sukor

    Drafter

  • NM

    Nur Maisarah Binti Mohd Shukri

    Drafter

  • AN

    Aida Nurain Binti Mohd

    Drafter

  • HH

    Hasya Hannani Binti Sobri

    Drafter

04

Certifications & Accreditation

Our equipment is calibrated and certified, and our surveyors hold UMAP course certificates alongside formal academic qualifications in surveying and engineering.

Radiodetection Certificate of Validation for RD8000/RD8200 locator, PASS result dated 17/01/2024

Equipment Calibration Certificate — RD8200

JUPEM Ground Penetrating Radar (GPR) calibration test form for DS2000 unit

Equipment Calibration Certificate — GPR

INSTUN utility mapping course certificates and Radiodetection RD8000 underground utility mapping certificate of completion

UMAP Course Certificate

Academic qualifications including UUM bachelor degree, Kolej Komuniti certificate and Politeknik Diploma in Geomatic

Academic Qualification — Land Surveying

Contact Us

Tell us about your corridor, site or excavation permit requirement — we will respond with a scope and quotation.